Requirements of Continuous Bridge Deck Paving on Curb Slipform Paver
release time:2020-5-30 10:17:16      hit count:1735

In order to realize continuous pavement of bridge deck by curb slipform paver, it is one of the necessary conditions to ensure the construction machinery and equipment that can pave the bridge deck.  First of all, the lateral formwork on the kerbstone slip-form paver can meet the requirements of the thickness of the thin reinforced concrete surface layer on the bridge deck, and the continuous steel bars, hanging ring steel bars, steel mesh, expansion joints and expansion joints on the bridge are proofread, which may block the slip of the lateral formwork of the kerbstone slip-form paver.  In particular, the blocking and advantage of the transverse complete continuous steel mesh on the bridge deck is that the movable height of the side formwork is only 5cm. Therefore, the side formwork must be a movable lifting type side formwork, which can be lifted to a zero position flush with the extrusion plate.  If there is a lengthened side formwork hanging behind the machine, it must also meet the thickness requirements of the paved bridge deck.

壓縮600.jpg

The bridge deck pavement of some expressways in our country has been damaged in a very short period of time. One of the most important reasons is that the thickness difference between the longitudinal and transverse pavement layers is too large. The longitudinal pre-stressed reverse arch is too large, some of which are more than 5cm and not less than 3-4 cm after pavement.  Transverse in precast reinforced concrete beam, not in the flange plate precast transverse slope, in the beam transverse flange plate between the wet joint, there is a transverse 2-4cm steps, in this case, the beam itself is not balanced in the vertical and horizontal direction, loss of pavement thickness of 2-4cm.  From the perspective of construction control, the minimum pavement thickness is 20cm, which is of great value to ensure the quality of actual bridge deck pavement.


During the construction process, the walking position of the planned kerbstone slipform paver for bridge deck pavement should be reserved, especially for central isolated expressways and grade I highway bridges.  First of all, the crawler of the two-lane large kerb slipform paver cannot travel in the central isolation and emptying position, nor at the outer edge of the main girder flange plate.  Secondly, the bridge engineering should divide the bridge deck paving work into kerbstone slipform pavers for road surface construction. At the same time, the guardrails on the bridge must be made after the kerbstone slipform pavers pave the bridge deck. Otherwise, the bridge railings will block the tracks of the kerbstone slipform pavers and have no paving position.


Previous: No more
Next: No more

Back to list

News you are interested in
体验区试看120秒啪啪免费| 日韩久久无码免费毛片软件| 国产女人18毛片水真多18精品| 久久久久亚洲AV成人网人人软件| 杨门十二寡妇肉床艳史电影| 久久精品国产亚洲AV无码娇色| 亚洲人成人无码网WWW国产| 偷拍真实夫妇作爱视频| 晚上看B站直播APP| 香蕉久久一区二区不卡无毒影院| 人妻丰满熟妇AV无码区乱| 香肠派对比赛服| 欧美另类69xxxxx| 天天爽夜夜爽夜夜爽| 无码人妻精品一区二区三区在线 | 无码久久精品国产亚洲AV影片| 中文字幕AV一区二区三区| 日本无码SM凌虐强制M字开腿| 国模吧无码一区二区三区| 少妇愉情理伦片丰满丰满午夜| 中文字幕日韩欧美一区二区三区| 亚洲国产婷婷香蕉久久久久久| 粉嫩名器少妇名器| 中国美女撒尿TXXXX视频偷窥| 在线观看的av网站| 国产深夜男女无套内射| 日韩精品一区二区亚洲AV观看| 免费观看a级片| 无码精品黑人一区二区三区| 亚洲国产AV一区二区三区| 亚洲欧美日韩一区二区| 顶级少妇做爰视频在线观看| 丰满多毛的大隂户视频| 甜蜜惩罚我是看守专用宠物 | 99这里只有精品| 无套熟女AV呻吟在线观看| 亚洲日韩国产精品乱-久| 国产精品扒开腿做爽爽爽A片小说 亚洲AV无码乱码在线观看性色 | 免费a级毛片出奶水| 啊灬啊灬啊灬快灬高潮少妇A片| 日本无码视频在线观看|